![]() Hydro EnergyHydropower comes from the exploitation of river water. The conversion of water power using hydroelectric projects (ydatotamieftiras, dam, closed conduit drop, hydraulic turbine, generator, canal brain) produces hydroelectric power. The hitherto untapped hydroelectric potential of mainland Greece in particular, could cover a significant proportion of total energy consumption. In several parts of the country can be built by private small hydropower plants for electricity production. Our company provides complete studies and measurements of hydrological data to develop and deploy Small Hydroelectric Projects, including feasibility of the project.
Feasibility Study As a first step in installing a Small Hydroelectric Project (SHP) is conducting a feasibility study of the corresponding project. This study is necessary because it needs before the start of the project, to investigate and then to examine and analyze various scenarios design and installation of a SHP-operation in the region. The company VisionTask prepare feasibility studies on the subject, has successfully carried out a number of relevant studies in various parts of Greece, with different requirements and economics, obtaining in this way considerable expertise.
Preliminary Installation |